Tuesday, January 17, 2012

safety drive

No.G/E.195/I/1/TRS Dt. 02.01.12.



K.MURALI CLI/RU

S.JAYARAJ CLI/RU

J.SABARINATHAN CLI/RU

G.SREENIVASULU CLI/RU

V.SIDDU SAHEB CLI/RU

P.VISWANATHAN CLI/RU

A.KAMALA KANNAN CLI/RU



Sub: -safety drive on locking of SLRs guard cabin to avoid

brake binding/wheel skidding -Reg

Ref: - Sr.DSO/GTL letter No. G/T389/Dec/2011 dated 27.12.2011

***

It is evident that brake binding/wheel skidding/flat tyre resulting in heavy
detention to trains noticed over Guntakal division. To curb such incidents DRM/GTL
desires to launch a safety drive on the above subject to avoid recurrence of such
occurrences.

Accordingly a 10 day safety drive is launched involving the officers and
supervisors with effect from 28.12.11 to 06.01.12

On completion of the above drive, report in the following format should be sent to
this office on or before 07.01.12 for further necessary action.



S.No

Subject

No. of
checks
conducted

Irregularities
noticed

Action
taken

1

Ensuring of locking of SLR when un
manned including luggage portions and
proper sealing.


2

Ensuring of proper release of SLRs hand
brake and indications of application /
release of hand brake painted correctly.


3

Whether hand brakes are in good working
order or not.



4

Availability of pressure gauges such as BP
and FP and ensuring requisite amount of
air pressure before starting.


5

Ensuring of proper loading /stacking of
parcels when in loaded condition.


6

Whether safety clam / bracket is provided
to guards emergency valve.


6

No. of Staff counseled.















(RAJEEV KUMAR)

ADEE/OPERATION/RU




safety drive

No.G/E.195/I/1/TRS Dt. 02.01.12.



K.MURALI CLI/RU

S.JAYARAJ CLI/RU

J.SABARINATHAN CLI/RU

G.SREENIVASULU CLI/RU

V.SIDDU SAHEB CLI/RU

P.VISWANATHAN CLI/RU

A.KAMALA KANNAN CLI/RU



Sub: -Manual isolation of bogie with out switching of the electronics

in 3Ph locos-Reg

Ref: - Dy.CEE/Loco/Lr No.E.221/RAP/Vol VIII/2881 dated 13.12.2011

********

RDSO letter No.EL/3.1.35/2 dated 10.06.11 advised modification in software in
processor FLG-1 & FLG-2 to facilitate manual isolation of bogie without switching OFF
the electronics (MCE). Accordingly the modification was carried out in all three phase
locos of SCR. All divisions were advised by this office vide Sr.DEE/ELS/LGD Lr No
C/E.221/ELS/LGD/Inves/2 dt 26.11.2011. to intimate about the modified instructions
through driver notice books/ technical bulletins and to launch a drive for counseling
/training of loco pilots by loco inspectors.

They have been cases of on line failures of LGD based thee phase locos in recent
times where the LP have initially isolated one bogie and further isolated the second bogie
using switch No 154 without switching OFF/ON of control electronics. In all these cases,
main power become OFF as both the bogies remained in isolated condition and led to
failure of the loco.

However, if a LP isolates healthy bogie instead of isolating the faulty bogie using
the 154 switch and further tries to isolates the faulty bogie, the initially isolated healthy
bogie would not come back into service and would continue to remain in isolation. The
initially isolated bogie would come back into service only if MCE (Control electronics)is
switched OFF and ON.

In view of the above, it is once again advised to counsel loco pilots for manual
isolation of bogies without switching OFF the electronics as per RDSO letter.

The following instructions are also to be circulated to loco pilots.



Manual isolation of a bogie can be done using switch No.154 without
switching OFF the control electronics. However, to bring back the manually
isolated bogie in to service, control electronics (MCE) needs to be switched OFF
and ON duly normalizing the switch No.154 position.



Compliance must be submitted this office at the earliest.



(RAJEEV KUMAR)

ADEE/OPERATION/RU




safety drive



ALL LOCO INSPECTORS



Sub: -counselling of Loco pilots working passenger, Mail & Express trains, regarding correct

procedure of attaching/ detaching of CBC coaching formations . – Reg.

Ref: 1.Dy.CEE/Loco/SC Lr.No.E223/Optg/Tech.Sfy.drive/Vol-I dated 31.12.2011

2. JPO No.E221/Loco body/Vol-II dated 07.04.2009

********

Train No.12717 Ratnachal Exp(VSKP-BZA) CBC coupling uncoupled on 30.12.2011 between THY-
AKP due to opening of front SLR CBC. LP re-coupled the formation and started without ensuring proper
locking resulting uncoupling of CBC again at NASP. Train was badly detained and has led to agitation by
passengers and also detention to an other train No.12864 express (YPR-HWH) at NASP.
Guidelines/Instructions already exit in above referred 2. JPO issued by Dy.CEE/Loco/SC Lr.No.E221/Loco
body/Vol-II dated 21.04.2009(copy of same available in WTT)for proper coupling of loco with CBC
coaching trains.

In this connection CEE/SC has ordered for a drive to council all loco pilots working coaching trains
i.e passenger & Mail/Express trains for ensuring correct procedure in attaching and detaching of locos
with formation by loco inspectors as well as loco instructors of ETTC/BZA. This exercise should be
completed at the earliest covering all loco pilots and compliance report to this effect be sent to HQrs on
completion of drive.

On completion of the above drive, report in the following format should be sent to this office on
or before 07.01.12 for further necessary action.







Sd/-

(A.KOTESWARA RAO)

Sr.DEE/TRACTION/GTL







Monday, January 16, 2012

safety drive

Sir,

Safety drive for 1 month on securing of trains/rakes at stations from
13.01.2012-12.02.2012 is here with attached, same compliance on daily
basis to be submitted to GM/SC at 10.00 hrs. so that the particulars
should be reached here at 09.30 hrs.
After completion of the Drive the same copy to be filled 1-8 by
individual CLI and also attach a Annexure on date wise counseling its
irregularities and action taken.

Thursday, January 12, 2012

SOB 6


South Central Railway



Office of the
DEE/Traction
Renigunta,
10.01.2012
No. R/E. 223/I/1/TR

                                      SOB No. __06___


                Sub:-   Hanging of tarpaulin in goods trains -Reg.
Ref:-  DME/P/GTL’s PC message No. 09/1/17 dt. 09.01.2012
****

While working of goods trains with tarpaulin covered on to the wagons, hanging from wagons is noticed, train to be stopped at first opportunity and all concern message to be given to controller without fail. The tarpaulin causing severe problem to OHE as well as Block Proving by Axle Counters en-route.
         
All Running staff to acknowledge and comply the instructions accordingly.


ADEE/Tr/RU

C/-  Sr. DEE/Tr/GTL for kind information please.
C/- DME/Power for kind information please.
C/- CC/IC/RU to display in SOB.
C/- All CLI’s for information and to Counsel Rng Staff.





SOB 5


South Central Railway

Office of the
DEE/Traction
Renigunta,
06.01.2012
No. R/E. 223/I/1/TR

                                      SOB No. __05___


                Sub:- Enhancement of sectional speed SR 50 Kmph to 75 Kmph
                    between VKT-KAPT stations-Reg.
Ref:- ADEN/NLR’s Lr.No. G35/RVNL/NLR Dt. Nil.
****

          With reference to the above, the sectional speed between VKT-KAPT in BZA division is enhanced from 50 Kmph to 75 Kmph, since entire track has been tamped by the Duomatic machine.


All Running staff to acknowledge the same.


ADEE/Tr/RU

C/-  Sr. DEE/Tr/GTL for kind information please.
C/-  CC/IC/RU to display in SOB.
C/-  CLI/IC/NRE to display in SOB.
C/-  All CLI’s for information and to Counsel Rng Staff.







SOB 4


South Central Railway

Office of the
DEE/Traction
Renigunta,
06.01.2012
No. R/E. 223/I/1/TR

                                      SOB No. __04___

                Sub:- PSR relaxation between LCR-DEPT in JTJ-ED section-Reg
Ref:- Sr.DEE/Tr/GTL’s AC No. 05/9 dt. 05.01.2012
****
          As per CPTM/MAS Lr.No. T458/I/REV/SA/WTT Dt. 28.12.11, the following corrections may be incorporated in the page no. 45 (JTJ-ED Section) of WTT No. 4 of SA division duly relaxing the permanent speed restriction as detailed below.
S.No
Section
From
Km.No
To
Km. No
Existing Speed
Proposed Speed
Brief Reason
Remarks
1
LCR-DEPT
301/10
308/26
25 Kmph
55 Kmph
Continuous falling gradient
A-Line
(Vaccum stock goods only)
2
LCR-DEPT
301/10
308/26
50 Kmph
55 Kmph
Continuous falling gradient
A-Line
(Air brake stock goods only)
3
LCR-DEPT
301/10
308/26
75 Kmph
90 Kmph
Continuous falling gradient
A-Line
(Coaching only)

All Running staff to acknowledge the same.


ADEE/Tr/RU

C/-  Sr. DEE/Tr/GTL for kind information please.
C/- CC/IC/RU to display in SOB.
C/- All CLI’s for information and to Counsel Rng Staff.


SOB 3


South Central Railway

Office of the
DEE/Traction
Renigunta,
06.01.2012
No. R/E. 223/I/1/TR

                                      SOB No. __03___


                Sub:-  Energizing  of 25 KV AC supply  ICL Siding at KMH
                    in RU-GTL section–Reg.
Ref:-  Sr.DEE/Tr/GTL’s AC No. 05/8 dt. 05.01.2012
****

With reference to the above  , the ICL siding at KMH is charged with 25 KV AC supply and the OHE is fit from location 307/4 to ICL/21 for AC traffic. The AC loco is permitted into ICL siding in section RU-GTL with effect from 05.01.2011 at 17.15 Hrs.
         
All Running staff to acknowledge the same.


ADEE/Tr/RU

C/-  Sr. DEE/Tr/GTL for kind information please.p
C/- CC/IC/RU to display in SOB.
C/- All CLI’s for information and to Counsel Rng Staff.







SOB 2


South Central Railway

Office of the
DEE/Traction
Renigunta,
04.01.2012
No. R/E. 223/I/1/TR

                                      SOB No. __02___

          Sub:-  Neutral Section between KKM-YGD (Up & Dn) in section RU-GTL section–Reg.
          Ref:-   Sr.DEE/Tr/GTL’s AC No. 02/3 dt. 02.01.2012
****

                With reference to the above, PTFE Neutral Section is provided between KKM - YGD (Up & Dn) in RU-GTL section and the warning boards are located as follows.
                  
Direction
Warning
Board
Location
at Km No.
Down
500 M
285/4
250 M
285/14
DJ Open
285/20
DJ Close
285/24
Up
500 M
286/5
250 M
285/29
DJ Open
285/23
DJ Close
285/19


All Running staff to acknowledge the same.


ADEE/Tr/RU

C/-  Sr. DEE/Tr/GTL for kind information please.
C/- CC/IC/RU to display in SOB.
C/-  CLI/IC/NRE to display in SOB.
C/- All CLI’s for information and counsel the Rng Staff.




SOB 1



                                                South Central Railway

                                                                                                                               Office of the
                                                                                                                               DEE/Traction
                                                                                                                               Renigunta,
                                                                                                                               02.01.2012
No. R/E. 223/I/1/TR

                                                  SOB No. __01___

Sub:- Energisation of 25 KV AC supply between KKM-MOO (Up & Dn)
in section RU-GTL section–Reg.
Ref:- Sr.DEE/Tr/GTL’s AC No. 31/7 dt. 31.12.2011

****

With reference to the above , 25 KV AC supply is charged at Km. No. 285/27-326/5 (beyond MOO) between KKM-MOO and RTPP siding at Km No. MOO/1001-RTPP/SH15 in section RU-GTL with effect from 31.12.2011 at 12.40 Hrs.

All Running staff to acknowledge the same.


                                                                                                                               ADEE/Tr/RU

C/- Sr. DEE/Tr/GTL for kind information please.
C/- CC/IC/RU to display in SOB.
C/- CLI/IC/NRE to display in SOB.
C/- All CLI’s for information and counsel the Rng Staff.